Harding Street
Marion County, Indiana · EIA plant ID 990 · Operator: Indianapolis Power & Light Co
Nameplate1,065MWSummer 966 MW
Generators10in service
Net generation4,151GWh12 mo to Aug 2026
Capacity factor50%gas/coal/oil units, summer MW
Heat rate11,990Btu/kWhfossil units, electric fuel, HHV
First online1958Runs as baseload
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 3,970 | — | — |
| 2002 | 3,784.1 | — | — |
| 2003 | 3,896.2 | 40.4% | 10,040 |
| 2004 | 4,019.3 | 41.5% | 10,271 |
| 2005 | 3,538 | 36.6% | 10,540 |
| 2006 | 3,862.9 | 40.0% | 10,346 |
| 2007 | 3,848.9 | 39.9% | 10,506 |
| 2008 | 3,406.5 | 35.2% | 10,529 |
| 2009 | 3,833.4 | 39.7% | 10,543 |
| 2010 | 3,333.3 | 34.5% | 10,617 |
| 2011 | 3,730.9 | 38.6% | 10,417 |
| 2012 | 3,784.7 | 39.1% | 10,450 |
| 2013 | 4,189.1 | 49.7% | 10,423 |
| 2014 | 3,847.9 | 46.4% | 10,415 |
| 2015 | 3,290.4 | 39.3% | 10,507 |
| 2016 | 1,999.5 | 24.1% | 11,212 |
| 2017 | 1,202.7 | 14.5% | 11,375 |
| 2018 | 1,253.3 | 15.1% | 11,710 |
| 2019 | 1,028 | 12.4% | 12,611 |
| 2020 | 1,614 | 19.4% | 12,387 |
| 2021 | 1,538 | 18.6% | 12,467 |
| 2022 | 1,379.7 | 16.7% | 12,639 |
| 2023 | 2,899.8 | 35.0% | 11,928 |
| 2024 | 3,654.4 | 44.0% | 12,156 |
| 2025 | 3,425.7 | 41.3% | 11,953 |
Fuel capability
Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo54,584 MMBtu
Last month with liquid burnAug 2026
Switch while operatingYes
Net summer MW on gas134
Net summer MW on oil134
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 5 | Natural Gas Steam Turbine | ST | 100 | 101 | Jun 1958 | Operating | — | coming soon |
| 6 | Natural Gas Steam Turbine | ST | 100 | 99 | May 1961 | Operating | — | coming soon |
| 7 | Natural Gas Steam Turbine | ST | 463 | 418 | Jul 1973 | Operating | — | coming soon |
| BAT1 | Batteries | BA | 20 | 20 | Jun 2016 | Operating | — | coming soon |
| GT1 | Petroleum Liquids | GT | 26 | 19.1 | May 1973 | Operating | — | coming soon |
| GT2 | Petroleum Liquids | GT | 26 | 17.9 | May 1973 | Operating | — | coming soon |
| GT4 | Natural Gas Fired Combustion Turbine | GT | 83 | 67 | Apr 1994 | Operating | — | coming soon |
| GT5 | Natural Gas Fired Combustion Turbine | GT | 83 | 67 | Jan 1995 | Operating | — | coming soon |
| GT6 | Natural Gas Fired Combustion Turbine | GT | 161 | 154 | May 2002 | Operating | — | coming soon |
| IC1 | Petroleum Liquids | IC | 2.7 | 3 | Apr 1967 | Operating | — | coming soon |
| 3 | Petroleum Liquids | ST | 43.8 | 35 | Sep 1941 | Retired Jun 2013 | — | coming soon |
| 4 | Petroleum Liquids | ST | 43.8 | 35 | Jun 1947 | Retired Jun 2013 | — | coming soon |
| GT3 | Petroleum Liquids | GT | 26 | 10 | May 1973 | Retired Jun 2013 | — | coming soon |
Owner / operator
Operator: Indianapolis Power & Light Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Indianapolis Power & Light Co | 100.0% | 1,065 MW |
Nearby plants
Within 80 km.
| Belmont | 4 MW | 1 km |
| Covanta Indianapolis Energy | 7 MW | 2.7 km |
| Maywood Photovoltaic Project | 8 MW | 4 km |
| Lilly Technical Center | 5 MW | 4.2 km |
| Indy Grocers | 1 MW | 4.6 km |
| CC Perry K | 5 MW | 6.3 km |