Snake River

Nome County, Alaska · EIA plant ID 90 · Operator: Nome Joint Utility Systems
OilOnshore Wind TurbinePetroleum Liquids

×1 MW wind retired since 2020 (latest Jun 2021)

Nameplate18MWSummer 18 MW
Generators7in service
Net generation32GWh12 mo to Dec 2025
Capacity factor22%gas/coal/oil units, summer MW
Heat rate8,958Btu/kWhfossil units, electric fuel, HHV
First online1991Runs as intermediate

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
024GWh200120032005200720092011201320152017201920212024

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2005201020152020202521.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
7,0008,0009,00010,000200520102015202020258,958 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200127.8——
200228.3——
200328.429.4%9,308
200427.228.1%9,552
200528.229.2%9,305
200627.128.1%9,804
200727.824.9%9,758
20084022.4%8,822
200934.319.2%9,133
201033.818.9%8,988
201132.518.2%9,110
201233.518.7%7,932
201332.823.4%8,674
201430.321.1%8,918
201529.320.4%8,956
201631.820.9%8,548
201732.521.3%8,548
201832.221.0%8,509
201932.621.0%8,377
202032.721.0%8,490
202133.521.8%8,578
202232.721.4%8,586
20243221.2%8,773
202531.921.5%8,958

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
12Petroleum LiquidsIC3.83.7Apr 1991Operating—coming soon
14Petroleum LiquidsIC21.9Dec 1999Operating—coming soon
15Petroleum LiquidsIC5.25.2Nov 2007Operating—coming soon
16Petroleum LiquidsIC5.25.2Nov 2007Operating—coming soon
18Petroleum LiquidsIC0.40.4Jan 2013Operating—coming soon
EWT 1Onshore Wind TurbineWT0.90.9Jul 2013Operating—ewt DW54-900
EWT 2Onshore Wind TurbineWT0.90.9Jul 2013Operating—ewt DW54-900
11Petroleum LiquidsIC1.51.5Mar 1988Retired Mar 2011—coming soon
5Petroleum LiquidsIC1.21.2Jan 1974Retired Jan 2001—coming soon
6Petroleum LiquidsIC11Jan 1972Retired Jan 2008—coming soon
9Petroleum LiquidsIC2.82.9Dec 1985Retired Mar 2011—coming soon
ENTOnshore Wind TurbineWT0.80.8Jan 2015Retired Jun 2021—entegrity wind systems EW50

Owner / operator

Operator: Nome Joint Utility Systems. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nome Joint Utility Systems100.0%18 MW

Nearby plants

Within 80 km.
No other plants within 80 km.