Lower Malad

Gooding County, Idaho · EIA plant ID 815 · Operator: Idaho Power Co
HydroConventional HydroelectricBA: IPCO
Nameplate14MWSummer 15 MW
Generators1in service
Net generation104GWh12 mo to Dec 2025
Capacity factor78%hydro units, summer MW
Heat rate—thermal plants only
First online1948

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%2005201020152020202577.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001110.5114.7%—
2002106.3110.3%—
200310287.5%—
2004100.986.4%—
2005101.186.8%—
2006112.496.5%—
2007104.689.8%—
2008103.188.2%—
2009105.178.4%—
201010779.8%—
2011110.982.8%—
2012105.978.8%—
201392.669.1%—
201439.729.6%—
201597.973.1%—
201610074.4%—
201799.874.5%—
201899.374.1%—
201997.772.9%—
20209772.2%—
202192.979.8%—
202296.974.7%—
2023106.878.6%—
202410273.5%—
2025104.477.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY13.515.3Oct 1948Operating—coming soon

Owner / operator

Operator: Idaho Power Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Idaho Power Co100.0%14 MW

Nearby plants

Within 80 km.
Upper Malad8 MW1.7 km
Lower Salmon60 MW2.7 km
Fossil Gulch11 MW3.6 km
Thousand Springs Wind Park12 MW5 km
Tuana Gulch Wind Park11 MW6.1 km
Oregon Trail Wind Park14 MW7.4 km