Blue Lake

Scott County, Minnesota · EIA plant ID 8027 · Operator: Northern States Power Co - Minnesota
Natural gasNatural Gas Fired Combustion TurbineNatural Gas Internal Combustion Engine⛽ Dual-fuelMISOBA: MISO

×227 MW oil retired since 2020 (latest May 2025)

Nameplate362MWSummer 328 MW
Generators5in service
Net generation435GWh12 mo to Dec 2025
Capacity factor14%gas/coal/oil units, summer MW
Heat rate11,374Btu/kWhfossil units, electric fuel, HHV
First online2005Runs as peaking

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-250255075100GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%2005201020152020202514.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
010,00020,0002005201020152020202511,374 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200114.10.9%18,942
20022.10.1%—
20034.60.3%22,919
200430.2%27,871
2005140.54.5%11,120
2006146.53.4%11,330
2007139.33.2%11,746
2008150.4%16,707
200913.40.3%16,047
2010117.42.9%11,383
2011952.4%11,338
2012246.56.2%11,109
2013109.12.8%11,458
201425.10.6%17,817
201569.31.8%11,708
2016197.55.0%10,925
201779.92.0%11,569
2018105.32.6%10,915
2019671.7%11,552
2020152.73.8%10,622
2021145.23.7%11,784
202288.42.2%11,711
202363.11.6%12,292
2024317.78.0%10,709
2025434.814.1%11,374

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo26,368 MMBtu
Last month with liquid burnNov 2025
Switch while operating—
Net summer MW on gas—
Net summer MW on oil—
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

⚠ EIA-860 vs 923: 923 shows liquid fuel burn in gas turbines but 860 lists no oil capability.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
7Natural Gas Fired Combustion TurbineGT166.3150Jun 2005Operating · retirement plannedDec 2029coming soon
8Natural Gas Fired Combustion TurbineGT166.3150Jun 2005Operating · retirement plannedDec 2029coming soon
BLL09Natural Gas Internal Combustion EngineIC9.89.4Dec 2025Operating—coming soon
BLL10Natural Gas Internal Combustion EngineIC9.89.4Dec 2025Operating—coming soon
BLL11Natural Gas Internal Combustion EngineIC9.89.4Dec 2025Operating—coming soon
5Natural Gas Fired Combustion TurbineGT150145planned Jun 2005not_current—coming soon
6Natural Gas Fired Combustion TurbineGT150145planned Jun 2005not_current—coming soon
1Petroleum LiquidsGT56.736Mar 1974Retired May 2025—coming soon
2Petroleum LiquidsGT56.736Mar 1974Retired May 2025—coming soon
3Petroleum LiquidsGT56.736Mar 1974Retired May 2025—coming soon
4Petroleum LiquidsGT56.739Apr 1974Retired May 2025—coming soon

Owner / operator

Operator: Northern States Power Co - Minnesota. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Northern States Power Co - Minnesota100.0%362 MW

Nearby plants

Within 80 km.
Blue Lake BESS—0.4 km
Blue Lake Solar3 MW1.2 km
Shakopee Met Council WTP1 MW1.3 km
Shakopee Energy Park47 MW3.9 km
Koda Biomass Plant23 MW8.5 km
EKS Landfillretired9.7 km