Baldwin City Plant No 2
Douglas County, Kansas · EIA plant ID 8020 · Operator: City of Baldwin City- (KS)
Nameplate11MWSummer 10 MW
Generators4in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate10,484Btu/kWhfossil units, electric fuel, HHV
First online2004Runs as rarely runs
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2004 | 0.1 | 0.3% | 12,985 |
| 2005 | 0.5 | 0.9% | 10,288 |
| 2006 | 1.2 | 2.1% | 10,014 |
| 2007 | 1.2 | 2.2% | 10,179 |
| 2008 | 0.3 | 0.6% | 10,812 |
| 2009 | 0.2 | 0.4% | 10,620 |
| 2010 | 0.6 | 1.1% | 15,439 |
| 2011 | 1.1 | 1.9% | 10,460 |
| 2012 | 0.9 | 1.7% | 10,439 |
| 2013 | 0.2 | 0.4% | 10,234 |
| 2014 | 0.1 | 0.2% | 10,482 |
| 2015 | 0.2 | 0.4% | 9,990 |
| 2016 | 0.2 | 0.3% | 10,293 |
| 2017 | 0.2 | 0.3% | 10,273 |
| 2018 | 0.3 | 0.6% | 10,339 |
| 2019 | 0.1 | 0.3% | 10,440 |
| 2020 | 0.1 | 0.2% | 9,793 |
| 2021 | 0.4 | 0.9% | 10,004 |
| 2022 | 0.4 | 0.8% | 10,200 |
| 2023 | 0.1 | 0.3% | 10,234 |
| 2024 | 0.2 | 0.4% | 10,085 |
| 2025 | 0.1 | 0.1% | 10,484 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 10 | Petroleum Liquids | IC | 2.2 | 2 | Jan 2025 | Operating | — | coming soon |
| 7 | Natural Gas Internal Combustion Engine | IC | 3.2 | 3 | Aug 2004 | Operating | — | coming soon |
| 8 | Natural Gas Internal Combustion Engine | IC | 3.2 | 3 | Aug 2004 | Operating | — | coming soon |
| 9 | Petroleum Liquids | IC | 2.2 | 2 | Jan 2025 | Operating | — | coming soon |
Owner / operator
Operator: City of Baldwin City- (KS). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| City of Baldwin City- (KS) | 100.0% | 11 MW |
Nearby plants
Within 80 km.
| Baldwin City Plant No 1 | 4 MW | 1.2 km |
| West Gardner | 408 MW | 18 km |
| Ottawa | 19 MW | 18.3 km |
| Kansas River Project | 7 MW | 23.5 km |
| Gardner Energy Center | 39 MW | 27.2 km |
| Lawrence Energy Center | 517 MW | 27.8 km |