Talbot County Energy

Talbot County, Georgia · EIA plant ID 7916 · Operator: Oglethorpe Power Corporation
Natural gasNatural Gas Fired Combustion Turbine⛽ Dual-fuelBA: SOCO

262 MW planned (Natural Gas Fired Combustion Turbine), first expected Jan 2029 · EIA-860M

Nameplate726MWSummer 572 MW
Generators6in service
Net generation412GWh12 mo to Dec 2025
Capacity factor8%gas/coal/oil units, summer MW
Heat rate11,477Btu/kWhfossil units, electric fuel, HHV
First online2002Runs as peaking

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-50050100150GWh200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%200520102015202020258.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
11,00012,00013,0002005201020152020202511,477 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2002192.37.8%11,656
200341.60.8%11,595
200474.51.3%12,176
200556.20.9%12,570
2006157.12.6%11,657
2007178.13.1%11,785
200833.90.6%12,480
200954.60.9%13,052
2010281.74.9%11,785
2011307.46.1%11,918
2012379.57.5%11,813
2013123.62.5%11,906
2014206.24.1%12,047
2015366.47.2%11,945
2016676.313.4%11,773
2017287.25.7%13,221
2018506.510.0%11,749
2019492.99.7%11,762
2020471.69.3%12,009
2021288.25.7%12,082
2022605.411.9%11,958
2023521.810.3%11,866
2024494.29.8%11,263
2025412.38.2%11,477

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo156,289 MMBtu
Last month with liquid burnDec 2025
Switch while operatingYes
Net summer MW on gas193
Net summer MW on oil193
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Natural Gas Fired Combustion TurbineGT12196.4May 2002Operating—coming soon
2Natural Gas Fired Combustion TurbineGT12195.2Apr 2002Operating—coming soon
3Natural Gas Fired Combustion TurbineGT12192.5Jun 2002Operating—coming soon
4Natural Gas Fired Combustion TurbineGT12196.7Jun 2002Operating—coming soon
5Natural Gas Fired Combustion TurbineGT12195.9May 2003Operating—coming soon
6Natural Gas Fired Combustion TurbineGT12195.7May 2003Operating—coming soon
7Natural Gas Fired Combustion TurbineGT262241planned Jan 2029Planned—coming soon

Owner / operator

Operator: Oglethorpe Power Corporation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Oglethorpe Power Corporation100.0%726 MW

Nearby plants

Within 80 km.
Muscogee Public Works2 MW19.1 km
Harris Shiloh2 MW23.2 km
Mossy Branch Battery Facility65 MW24 km
North Highlands30 MW30.2 km
Oliver Dam60 MW30.6 km
Taylor8 MW32.4 km