Terry Bundy Generating Station
Lancaster County, Nebraska · EIA plant ID 7887 · Operator: Lincoln Electric System
104 MW planned (Natural Gas Fired Combustion Turbine), first expected Jun 2029 · EIA-860M
Nameplate216MWSummer 176 MW
Generators8in service
Net generation148GWh12 mo to Aug 2026
Capacity factor8%gas/coal/oil units, summer MW
Heat rate10,304Btu/kWhfossil units, electric fuel, HHV
First online2003Runs as peaking
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2003 | 0 | 0.0% | — |
| 2004 | 108.1 | 8.9% | 9,745 |
| 2005 | 184.5 | 12.3% | 8,778 |
| 2006 | 135.9 | 9.3% | 8,940 |
| 2007 | 212.9 | 15.9% | 8,849 |
| 2008 | 133.8 | 9.0% | 8,830 |
| 2009 | 54.9 | 3.8% | 9,442 |
| 2010 | 109.8 | 7.5% | 9,071 |
| 2011 | 86.9 | 6.8% | 9,056 |
| 2012 | 139.2 | 10.9% | 9,158 |
| 2013 | 78.4 | 5.2% | 10,001 |
| 2014 | 68.6 | 4.6% | 10,637 |
| 2015 | 76.4 | 4.7% | 10,653 |
| 2016 | 190.8 | 10.6% | 9,150 |
| 2017 | 148.8 | 7.8% | 10,574 |
| 2018 | 229.8 | 13.6% | 9,950 |
| 2019 | 197.4 | 11.9% | 10,282 |
| 2020 | 184.5 | 10.7% | 10,480 |
| 2021 | 222.2 | 13.5% | 9,706 |
| 2022 | 223.9 | 14.0% | 9,644 |
| 2023 | 89.1 | 4.5% | 9,964 |
| 2024 | 158.4 | 9.3% | 10,338 |
| 2025 | 136 | 7.4% | 10,569 |
Fuel capability
Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo125,160 MMBtu
Last month with liquid burnApr 2026
Switch while operatingYes
Net summer MW on gas142
Net summer MW on oil135
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Natural Gas Fired Combined Cycle | CA | 28.2 | 27.4 | Aug 2004 | Operating | — | coming soon |
| 2 | Natural Gas Fired Combined Cycle | CT | 60.5 | 47.3 | Oct 2003 | Operating | — | coming soon |
| 3 | Natural Gas Fired Combined Cycle | CT | 60.5 | 47.1 | Apr 2004 | Operating | — | coming soon |
| 4 | Natural Gas Fired Combustion Turbine | GT | 60.5 | 47.6 | Aug 2003 | Operating | — | coming soon |
| BSU | Petroleum Liquids | IC | 1.8 | 1.6 | Jul 2004 | Operating | — | coming soon |
| LFG1 | Landfill Gas | IC | 1.6 | 1.6 | Jan 2014 | Operating | — | coming soon |
| LFG2 | Landfill Gas | IC | 1.6 | 1.6 | Jan 2014 | Operating | — | coming soon |
| LFG3 | Landfill Gas | IC | 1.6 | 1.6 | Jan 2014 | Operating | — | coming soon |
| 5 | Natural Gas Fired Combustion Turbine | GT | 52 | 46.9 | planned Jun 2029 | Planned | — | coming soon |
| 6 | Natural Gas Fired Combustion Turbine | GT | 52 | 46.9 | planned Jun 2029 | Planned | — | coming soon |
| WT1 | Onshore Wind Turbine | WT | 0.7 | 0.7 | Dec 1998 | not_current | — | coming soon |
| WT2 | Onshore Wind Turbine | WT | 0.7 | 0.7 | Oct 1999 | not_current | — | coming soon |
Owner / operator
Operator: Lincoln Electric System. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Lincoln Electric System | 100.0% | 216 MW |
Nearby plants
Within 80 km.
| Salt Valley Wind Plant | retired | 1 km |
| Archer Daniels Midland Lincoln | 8 MW | 4.8 km |
| J Street | 27 MW | 14 km |
| 2nd & N BESS | 3 MW | 14 km |
| Holdrege Solar Center | 4 MW | 19.8 km |
| Rokeby | 266 MW | 22.4 km |