← Back to map

Earlville

Delaware County, Iowa · EIA plant ID 7865 · Operator: City of Earlville - (IA)
OilPetroleum LiquidsMISOBA: MISO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate9,429Btu/kWhfossil units, electric fuel, HHV
First online2001Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
05101520MWh200220042006200820102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%1%1%200520102015202020250.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,0008,00010,000200520102015202020259,429 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20020.10.4%9,946
20030.21.1%9,904
20040.10.6%9,922
200500.2%10,395
200600.1%10,370
20070.10.4%9,842
200800.1%10,706
200900.1%8,455
201000.1%8,130
20110.10.3%8,078
201200.1%9,222
201300.1%7,773
201400.1%8,182
201500.1%8,706
201600.1%8,737
201700.1%8,400
201800.3%8,738
201900.1%9,600
202000.1%8,769
202100.1%7,818
202200.1%6,706
202300.1%7,500
202400.0%6,714
202500.0%9,429

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Petroleum LiquidsIC1.81.8Jul 2001Operating—coming soon

Owner / operator

Operator: City of Earlville - (IA). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
City of Earlville - (IA)100.0%2 MW

Nearby plants

Within 80 km.
Elk Wind Farm41 MW12.8 km
CED Manchester Wind8 MW16.7 km
Hopkinton4 MW16.9 km
Independence Wind Farm55 MW25.3 km
Strawberry Point DPC Solar1 MW30.3 km
Cascade7 MW30.5 km