← Back to map

Beaver Island

Charlevoix County, Michigan · EIA plant ID 7831 · Operator: Great Lakes Energy Coop
OilPetroleum LiquidsMISOBA: MISO
Nameplate3MWSummer 3 MW
Generators3in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online2000Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-200204060MWh200220042006200820102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%1%1%2%200520102015202020250.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
010,00020,00030,0002005201020152020
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20020.10.4%9,472
20030.20.7%18,744
20040.10.6%11,917
200500.0%—
2006-0.1-0.5%—
20070.31.4%9,214
20080.20.6%10,151
20090.20.7%14,196
20100.10.6%15,940
20110.20.9%8,848
20120.31.1%6,404
20130.20.7%9,918
20140.10.3%28,920
20150.10.3%26,303
20160.10.3%29,260
20170.10.4%27,466
20180.10.2%—
20190.10.4%27,907
202000.2%—
20210.10.3%27,393
20220.10.3%—
20230.10.3%26,986
20240.10.3%—
20250.10.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Petroleum LiquidsIC1.21Sep 2000Operating (Standby / backup)—coming soon
2Petroleum LiquidsIC1.21Sep 2000Operating (Standby / backup)—coming soon
3Petroleum LiquidsIC0.90.8Jan 2001Operating (Standby / backup)—coming soon

Owner / operator

Operator: Great Lakes Energy Coop. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Great Lakes Energy Coop100.0%3 MW

Nearby plants

Within 80 km.
Bay Windpower Iretired61.1 km
Manistique5 MW62 km
Newberryretired69.3 km
Heritage Garden Wind Farm I LLC28 MW78.7 km
Garden 1 Solar Park1 MW78.7 km
Garden 2 Solar Park1 MW78.7 km