← Back to map

Goat Lake Hydro

Hoonah-Angoon County, Alaska · EIA plant ID 7751 · Operator: Alaska Power and Telephone Co
HydroConventional Hydroelectric
Nameplate4MWSummer 4 MW
Generators1in service
Net generation14GWh12 mo to Dec 2025
Capacity factor40%hydro units, summer MW
Heat rate—thermal plants only
First online1997

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
012GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202539.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200118.552.7%—
200218.753.4%—
200318.753.3%—
200418.552.8%—
200511.733.5%—
200622.263.2%—
200722.163.0%—
200820.558.3%—
200916.848.0%—
201015.744.8%—
201115.845.2%—
201216.346.4%—
201315.544.3%—
201415.143.2%—
201515.744.8%—
20161748.3%—
201715.644.5%—
201814.942.6%—
201915.444.0%—
202015.143.0%—
202114.541.3%—
202215.744.9%—
202315.845.0%—
202415.142.9%—
20251439.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY44Dec 1997Operating—coming soon

Owner / operator

Operator: Alaska Power and Telephone Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Alaska Power and Telephone Co100.0%4 MW

Nearby plants

Within 80 km.
Skagway5 MW10.7 km
Kasidaya Creek Hydro3 MW16 km
Haines8 MW35.9 km