Walter F George
Clay County, Georgia · EIA plant ID 761 · Operator: USCE-Mobile District
Nameplate168MWSummer 168 MW
Generators4in service
Net generation341GWh12 mo to Dec 2025
Capacity factor23%hydro units, summer MW
Heat rate—thermal plants only
First online1963
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 266.1 | 20.9% | — |
| 2002 | 204.4 | 16.1% | — |
| 2003 | 454.8 | 35.8% | — |
| 2004 | 370.6 | 29.1% | — |
| 2005 | 446.2 | 35.1% | — |
| 2006 | 287.6 | 22.7% | — |
| 2007 | 208.6 | 15.9% | — |
| 2008 | 252.1 | 18.1% | — |
| 2009 | 489 | 34.1% | — |
| 2010 | 358.8 | 24.4% | — |
| 2011 | 264.8 | 18.0% | — |
| 2012 | 165 | 11.2% | — |
| 2013 | 468 | 31.8% | — |
| 2014 | 408.7 | 27.8% | — |
| 2015 | 396.8 | 27.0% | — |
| 2016 | 352.1 | 23.9% | — |
| 2017 | 328.3 | 22.3% | — |
| 2018 | 486.8 | 33.1% | — |
| 2019 | 472.1 | 32.1% | — |
| 2020 | 585.4 | 39.7% | — |
| 2021 | 535.9 | 36.4% | — |
| 2022 | 425 | 28.9% | — |
| 2023 | 426.4 | 29.0% | — |
| 2024 | 421.7 | 28.6% | — |
| 2025 | 340.7 | 23.2% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Conventional Hydroelectric | HY | 42 | 42 | Mar 1963 | Operating | — | coming soon |
| 2 | Conventional Hydroelectric | HY | 42 | 42 | May 1963 | Operating | — | coming soon |
| 3 | Conventional Hydroelectric | HY | 42 | 42 | Sep 1963 | Operating | — | coming soon |
| 4 | Conventional Hydroelectric | HY | 42 | 42 | Nov 1963 | Operating | — | coming soon |
Owner / operator
Operator: USCE-Mobile District. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| USCE-Mobile District | 100.0% | 168 MW |
Nearby plants
Within 80 km.
| SR Clay, LLC | 106 MW | 17.9 km |
| Lancaster Solar GA | 80 MW | 29.9 km |
| SR Arlington II | 103 MW | 32.2 km |
| SR Arlington I | 20 MW | 32.8 km |
| SR Cedar Springs, LLC | 70 MW | 42.2 km |
| Joseph M Farley | 1,776 MW | 44.9 km |