River Road Gen Plant

Clark County, Washington · EIA plant ID 7605 · Operator: PUD No 1 of Clark County - (WA)
Natural gasNatural Gas Fired Combined CycleBA: BPAT
Nameplate248MWSummer 230 MW
Generators1in service
Net generation877GWh12 mo to Aug 2026
Capacity factor44%gas/coal/oil units, summer MW
Heat rate7,518Btu/kWhfossil units, electric fuel, HHV
First online1997Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150GWh200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%2005201020152020202543.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
7,0007,2007,400200520102015202020257,518 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20031,385.575.3%7,200
20041,744.890.3%7,170
20051,635.184.8%7,173
20061,289.866.9%7,236
20071,521.979.0%7,273
20081,616.383.6%7,322
20091,624.984.3%7,407
20101,679.987.2%7,335
20111,016.152.7%7,266
2012846.143.8%7,266
20131,729.889.8%7,225
20141,577.181.8%7,316
20151,812.594.0%7,288
20161,440.674.6%7,293
20171,259.665.4%7,299
20181,192.661.9%7,229
20191,746.390.6%7,347
20201,617.183.7%7,224
20211,942.6100.8%7,267
20221,695.688.0%7,370
20231,828.694.9%7,309
20241,561.677.3%7,391
20251,317.465.4%7,398

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Natural Gas Fired Combined CycleCS248230Dec 1997Operating—coming soon

Owner / operator

Operator: PUD No 1 of Clark County - (WA). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
PUD No 1 of Clark County - (WA)100.0%248 MW

Nearby plants

Within 80 km.
Seaside BESS200 MW5.8 km
Goodling Community Solar1 MW9.7 km
Oregon Convention Center1 MW14.3 km
Constable BESS75 MW19.7 km
Sundial (Troutdale) BESS200 MW25.8 km
MilfordSolar OR3 MW26.7 km