← Back to map

Stone Creek

Clackamas County, Oregon · EIA plant ID 7508 · Operator: Eugene Water & Electric Board
HydroConventional HydroelectricBA: PGE
Nameplate12MWSummer 7 MW
Generators1in service
Net generation54GWh12 mo to Dec 2025
Capacity factor89%hydro units, summer MW
Heat rate—thermal plants only
First online1994

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02468GWh200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%2005201020152020202588.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200335.537.8%—
200449.179.8%—
200533.354.3%—
200667.8110.6%—
200765106.0%—
200863.8103.8%—
200964.2104.7%—
201059.496.9%—
201179.6129.8%—
201258.895.7%—
201362101.1%—
201463.7103.9%—
20154979.9%—
201650.582.1%—
201761.5100.3%—
201850.482.2%—
201942.669.4%—
202031.350.8%—
20213760.4%—
202250.682.5%—
20234675.0%—
202452.385.1%—
202554.488.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY127Jan 1994Operating—coming soon

Owner / operator

Operator: Eugene Water & Electric Board. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Eugene Water & Electric Board100.0%12 MW

Nearby plants

Within 80 km.
Tualatin Battery Energy Storage System—12.7 km
Oak Grove51 MW15.1 km
Timothy Lake Powerhouse1 MW33.8 km
North Fork41 MW35.7 km
Brightwood Solar, LLC10 MW37.2 km
Faraday37 MW39.8 km