← Back to map

Bradley Lake

Kenai Peninsula County, Alaska · EIA plant ID 7367 · Operator: Homer Electric Assn Inc
HydroConventional HydroelectricBA: CEA
Nameplate126MWSummer 126 MW
Generators2in service
Net generation415GWh12 mo to Dec 2025
Capacity factor38%hydro units, summer MW
Heat rate—thermal plants only
First online1991

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2005201020152020202537.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001345.731.3%—
2002484.943.9%—
2003500.945.4%—
2004429.738.8%—
2005452.841.0%—
2006343.831.1%—
2007336.330.5%—
2008296.826.8%—
2009362.332.8%—
2010348.331.6%—
2011303.927.5%—
2012397.435.9%—
2013368.333.4%—
2014432.639.2%—
2015471.742.7%—
2016430.538.9%—
2017387.135.1%—
2018404.536.6%—
2019413.637.5%—
2020466.642.2%—
202139135.4%—
2022376.734.1%—
2023395.135.8%—
2024397.135.9%—
2025414.737.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY6363Jun 1991Operating—coming soon
2Conventional HydroelectricHY6363Jun 1991Operating—coming soon

Owner / operator

Operator: Homer Electric Assn Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Alaska Energy Authority100.0%126 MW

Nearby plants

Within 80 km.
Seldovia2 MW57.6 km