← Back to map

Barrow

North Slope County, Alaska · EIA plant ID 7173 · Operator: Barrow Utils & Elec Coop, Inc
Natural gasNatural Gas Fired Combustion Turbine⛽ Dual-fuel

×3 MW natural gas retired since 2020 (latest Nov 2022)

Nameplate17MWSummer 17 MW
Generators5in service
Net generation45GWh12 mo to Dec 2025
Capacity factor30%gas/coal/oil units, summer MW
Heat rate17,852Btu/kWhfossil units, electric fuel, HHV
First online1977Runs as intermediate

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2005201020152020202529.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
14,00016,00018,0002005201020152020202517,852 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200150.5——
200246——
20034526.6%15,596
200446.127.2%15,879
200547.528.1%14,566
20064627.2%15,084
20074627.2%14,640
200847.426.6%14,937
200948.427.2%14,927
201049.828.0%14,936
201150.228.2%14,854
201249.627.8%15,278
201350.328.3%15,082
201449.627.9%15,146
201550.128.2%15,114
201650.228.1%15,064
201749.227.7%15,656
201848.327.1%15,711
201947.626.8%15,712
202051.128.7%14,736
202147.326.6%15,808
202249.428.5%15,829
202346.730.8%16,574
202445.930.2%17,005
202544.929.6%17,852

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo24 MMBtu
Last month with liquid burnDec 2025
Switch while operatingYes
Net summer MW on gas13
Net summer MW on oil13
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
11Natural Gas Fired Combustion TurbineGT4.84.8Nov 1996Operating—coming soon
12Natural Gas Fired Combustion TurbineGT55Jun 2001Operating—coming soon
6Natural Gas Fired Combustion TurbineGT2.52.5Feb 1977Operating—coming soon
7Natural Gas Fired Combustion TurbineGT2.52.5Dec 1980Operating—coming soon
8Natural Gas Fired Combustion TurbineGT2.52.5Oct 1982Operating—coming soon
10Natural Gas Internal Combustion EngineIC1.51.5Nov 1994Retired Nov 2022—coming soon
9Natural Gas Internal Combustion EngineIC1.51.5Nov 1994Retired Nov 2022—coming soon

Owner / operator

Operator: Barrow Utils & Elec Coop, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Barrow Utils & Elec Coop, Inc56.6%10 MW
North Slope Borough Power & Light (AK)43.4%8 MW

Nearby plants

Within 80 km.
No other plants within 80 km.