← Back to map

Lime Creek

Cerro Gordo County, Iowa · EIA plant ID 7155 · Operator: Interstate Power and Light Co
OilPetroleum LiquidsMISOBA: MISO
Nameplate90MWSummer 71 MW
Generators2in service
Net generation1GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate16,094Btu/kWhfossil units, electric fuel, HHV
First online1991Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-20246GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%2%4%6%200520102015202020250.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,00015,00020,00025,00030,0002005201020152020202516,094 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20015.50.9%17,177
20024.80.7%15,835
20039.51.5%14,748
20044.20.7%16,377
200532.65.2%15,328
200633.85.5%14,610
200733.45.6%14,362
20084.40.7%18,768
20090.50.1%—
2010-0.5-0.1%—
2011-0.1-0.0%—
20120.90.1%29,270
2013-1-0.2%—
2014-0.7-0.1%—
20150.10.0%—
20160.10.0%—
20170.40.1%—
20181.80.3%16,416
20190.60.1%—
2020-0.3-0.1%—
20210.70.1%—
20221.80.3%18,637
20230.40.1%17,258
20240.10.0%15,870
20251.10.2%16,094

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Petroleum LiquidsGT45.135.5May 1991Operating—coming soon
2Petroleum LiquidsGT45.135.3May 1991Operating—coming soon

Owner / operator

Operator: Interstate Power and Light Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Interstate Power and Light Co100.0%90 MW

Nearby plants

Within 80 km.
Roeder Family Wind Farm LLC2 MW8.4 km
REG Mason City Solar3 MW13.3 km
Northern Iowa Windpower II80 MW14.6 km
CED Mason City Wind8 MW14.7 km
Windwalkers LLC2 MW15.2 km
Top of Iowa Windfarm III30 MW15.5 km