Bungalow Solar, LLCUnder construction
Tazewell County, Illinois · EIA plant ID 70562 · Operator: Dimension Energy LLC
5 MW under construction (Solar Photovoltaic), first expected Nov 2026 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service · 5 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| BUNGA | Solar Photovoltaic | PV | 5 | 5 | planned Nov 2026 | Under construction | — | coming soon |
Owner / operator
Operator: Dimension Energy LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Tazewell Gas Recovery | 2 MW | 8.1 km |
| Schmidt Huser Solar, LLC | 2 MW | 10.4 km |
| Pearl St Solar 1, LLC | 2 MW | 12.2 km |
| Archer Daniels Midland Peoria | 18 MW | 14.1 km |
| Fast Ave Solar LLC | — | 17.2 km |
| SCS Galena 012589 Peoria, LLC | 2 MW | 18.1 km |