← Back to map

Piney River VA BESS 1Under construction

Nelson County, Virginia · EIA plant ID 70551 · Operator: Piney River VA BESS 1 LLC
BatteryPJMBA: PJM

4 MW under construction (Batteries), first expected Nov 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 4 MW building
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
90915BatteriesBA44planned Nov 2026Under construction—coming soon

Owner / operator

Operator: Piney River VA BESS 1 LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Caden Energix Piney River LLC—2.9 km
Colleen VA BESS 1—5.3 km
Amherst Solar Facility (VA)5 MW18.4 km
Reusens13 MW32.5 km
Shenvalee Solar—34.1 km
Coleman Falls2 MW35.3 km