← Back to map

4786A George Washington, LLCUnder construction

Garrett County, Maryland · EIA plant ID 70508 · Operator: Pivot Energy
SolarPJMBA: PJM

2 MW under construction (Solar Photovoltaic), first expected Dec 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 2 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
4786ASolar PhotovoltaicPV22planned Dec 2026Under construction—coming soon

Owner / operator

Operator: Pivot Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Roth Rock North Wind Farm, LLC10 MW2.3 km
4786B George Washington, LLC—3.5 km
Roth Rock Wind Farm LLC40 MW6.9 km
MD CDG 0012 MW8.3 km
MD CDG 0022 MW8.4 km
TPE MD GA1372 MW9.6 km