← Back to map

Campbellsport Solar WI, LLCPlanned

Fond Du Lac County, Wisconsin · EIA plant ID 70469 · Operator: OneEnergy, Inc.
SolarMISOBA: MISO

6 MW planned (Solar Photovoltaic), first expected Dec 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
20261Solar PhotovoltaicPV66planned Dec 2026Planned—coming soon

Owner / operator

Operator: OneEnergy, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Auburn Solar WI, LLC5 MW3.7 km
Cedar Ridge68 MW12.8 km
Springfield Solar (WI)100 MW13.3 km
Forward Wind Energy Center129 MW17.9 km
Regal Ware2 MW18.4 km
Washington County2 MW19.3 km