← Back to map

Red Oak Ridge Energy Center LLCPlanned

Kenosha County, Wisconsin · EIA plant ID 70453 · Operator: Invenergy Services LLC
Natural gasMISOBA: MISO

1,210 MW planned (Natural Gas Fired Combustion Turbine), first expected Dec 2029 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CT4Natural Gas Fired Combustion TurbineGT242242planned Dec 2029Planned—coming soon
CT5Natural Gas Fired Combustion TurbineGT242242planned Dec 2029Planned—coming soon
RDOR1Natural Gas Fired Combustion TurbineGT242242planned Dec 2029Planned—coming soon
RDOR2Natural Gas Fired Combustion TurbineGT242242planned Dec 2029Planned—coming soon
RDOR3Natural Gas Fired Combustion TurbineGT242242planned Dec 2029Planned—coming soon

Owner / operator

Operator: Invenergy Services LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Paris Solar310 MW5.2 km
Paris (WI)382 MW5.4 km
Strawberry Creek Solar WI, LLC6 MW6.4 km
Pheasant Run Landfill Gas Recovery9 MW8.4 km
UW Parkside2 MW9.3 km
Waxdale12 MW10.9 km