← Back to map

Palo Duro Energy Storage IIPlanned

Ochiltree County, Texas · EIA plant ID 70441 · Operator: Palo Duro Energy Center, LLC
BatterySPPBA: SWPP

166 MW planned (Batteries), first expected May 2029 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PALO2BatteriesBA165.7165.7planned May 2029Planned—coming soon

Owner / operator

Operator: Palo Duro Energy Center, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Palo Duro Energy Storage—0.4 km
Palo Duro Wind282 MW18.6 km
Balko Wind LLC300 MW19.2 km
Ponderosa Wind II100 MW27.4 km
Aeolus Wind Facilityretired28.8 km
Porterhouse Wind (4) LLC80 MW33.2 km