← Back to map

Royal SlopePlanned

Grant County, Washington · EIA plant ID 70419 · Operator: Royal Slope Solar LLC
SolarBA: BPAT

520 MW planned (Batteries, Solar Photovoltaic), first expected Oct 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
RSBABatteriesBA260260planned Oct 2027Planned—coming soon
RSPVSolar PhotovoltaicPV260260planned Oct 2027Planned—coming soon

Owner / operator

Operator: Royal Slope Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Wanapum1,220 MW3.9 km
Vantage Wind Energy LLC90 MW21.4 km
Priest Rapids950 MW26.5 km
Wild Horse273 MW27.6 km
PEC Headworksretired30.8 km
Ostrea Solar, LLC80 MW39.6 km