Steel River Solar Phase 2Under construction

Mississippi County, Arkansas · EIA plant ID 70398 · Operator: Cypress Creek Renewables
SolarMISOBA: MISO

750 MW under construction (Batteries, Solar Photovoltaic), first expected Jul 2029 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 750 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SRSB2BatteriesBA250250planned Jul 2029Under construction—coming soon
SRSP2Solar PhotovoltaicPV500500planned Jul 2029Under construction—coming soon

Owner / operator

Operator: Cypress Creek Renewables. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Steel River Solar Phase 3—0 km
Steel River Solar Phase 1—0 km
Rivercrest SD1 MW4.4 km
Driver Solar150 MW13.5 km
Plum Point Energy Station720 MW16.5 km
Osceola (AR)2 MW17.8 km