Sycamore Riverside Energy, LLCPlanned

Sullivan County, Indiana · EIA plant ID 70359 · Operator: Invenergy Services LLC
Natural gasPJMBA: PJM

964 MW planned (Natural Gas Fired Combustion Turbine), first expected Mar 2029 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SYRVSNatural Gas Fired Combustion TurbineGT964964planned Mar 2029Planned—coming soon

Owner / operator

Operator: Invenergy Services LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Fairbanks Solar Project250 MW3.1 km
Trade Post Solar200 MW4.1 km
River Ferry Solar 1165 MW8.6 km
Sullivan Solar, LLC5 MW14.7 km
Merom1,080 MW16.4 km
Osprey Point RES13 MW17.6 km