IL - Forefront Ameren- Route 40Under construction

Peoria County, Illinois · EIA plant ID 70350 · Operator: IL Solar Route 40 Project2, LLC
SolarMISOBA: MISO

2 MW under construction (Solar Photovoltaic), first expected Dec 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 2 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
RT40Solar PhotovoltaicPV22planned Dec 2026Under construction—coming soon

Owner / operator

Operator: IL Solar Route 40 Project2, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
IL West Hallock Project12 MW0.1 km
IL-Forefront Ameren-Truitt 1—1.1 km
IL-Forefront Ameren-Truitt 2—1.1 km
Allen CSG—8.7 km
IL-Forefront-Ameren- Chillicothe 12 MW8.8 km
Princeville Solar, LLC2 MW11.1 km