← Back to map

Blackwater Solar Center - NMPlanned

Roosevelt County, New Mexico · EIA plant ID 70297 · Operator: Blackwater Solar Center, LLC
SolarSPPBA: SWPP

200 MW planned (Solar Photovoltaic), first expected Dec 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BWTSSolar PhotovoltaicPV200200planned Dec 2027Planned—coming soon

Owner / operator

Operator: Blackwater Solar Center, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Pluma - Clovis Concrete North CSG3 MW8.5 km
Pluma - Curry Road North3 MW11.5 km
Texico Wind Ranch LPretired11.8 km
SoCore Clovis 12 MW16.6 km
Sagamore Wind522 MW39.4 km
Milo Wind Project LLC50 MW46.5 km