← Back to map

Cantaloupe SolarUnder construction

Reeves County, Texas · EIA plant ID 70204 · Operator: Cantaloupe Solar - ERCOT
SolarERCOTBA: ERCO

300 MW under construction (Solar Photovoltaic), first expected Dec 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 300 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CANPVSolar PhotovoltaicPV300300planned Dec 2027Under construction—coming soon

Owner / operator

Operator: Cantaloupe Solar - ERCOT. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Matta Power Station10 MW2.1 km
Toyah Power Station10 MW6.4 km
Hoef's Road Storageretired19.3 km
Faulkner10 MW26.1 km
Barilla Solar30 MW31.7 km
Flower Valley II101 MW32.7 km