Pivot Solar 50 LLCUnder construction
Weld County, Colorado · EIA plant ID 70201 · Operator: Pivot Energy
4 MW under construction (Solar Photovoltaic), first expected Oct 2026 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service · 4 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| PS50 | Solar Photovoltaic | PV | 4 | 4 | planned Oct 2026 | Under construction | — | coming soon |
Owner / operator
Operator: Pivot Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| USS Auburn Solar | 5 MW | 0.6 km |
| SR Kersey II | 1 MW | 7.1 km |
| SR Kersey | 4 MW | 7.4 km |
| Pivot Solar 56 LLC | — | 7.7 km |
| Pivot Solar 30 | 5 MW | 7.7 km |
| Oak Leaf Solar XXVII LLC | 2 MW | 8.3 km |