Trinidad SolarPlanned

Las Animas County, Colorado · EIA plant ID 70118 · Operator: Clay Creek Energy, LLC
SolarBA: WACM

2 MW planned (Solar Photovoltaic), first expected Apr 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Solar PhotovoltaicPV1.81.8planned Apr 2027Planned—coming soon

Owner / operator

Operator: Clay Creek Energy, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Trinidad (CO)9 MW0.9 km
Spanish Peaks Solar140 MW21.4 km
Elk Run—29.9 km
San Isabel Solar, LLC30 MW37.3 km
Peak View Wind Farm61 MW58.3 km
Busch Ranch II Wind Farm59 MW64.8 km