← Back to map

Diamondback SolarPlanned

Starr County, Texas · EIA plant ID 69982 · Operator: Diamondback Solar, LLC
SolarERCOTBA: ERCO

200 MW planned (Solar Photovoltaic), first expected Dec 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
3569Solar PhotovoltaicPV200200planned Dec 2027Planned—coming soon

Owner / operator

Operator: Diamondback Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Rising Star Solar—9.9 km
Los Vientos Windpower III200 MW11.3 km
Mesteno202 MW11.7 km
Rio Grande City BESS 210 MW12.4 km
SMT Rio Grande II LLC10 MW12.5 km
Los Vientos Windpower IV200 MW12.8 km