Cypress Harvest Solar StationPlanned

Iberville County, Louisiana · EIA plant ID 69952 · Operator: Entergy Louisiana LLC
SolarMISOBA: MISO

400 MW planned (Batteries, Solar Photovoltaic), first expected Aug 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CH1Solar PhotovoltaicPV200200planned Aug 2028Planned—coming soon
CH2BatteriesBA200200planned Sep 2029Planned—coming soon

Owner / operator

Operator: Entergy Louisiana LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Axiall Plaquemine306 MW8 km
LaO Energy Systemsretired9.5 km
Plaquemine Cogeneration Plant1,085 MW9.8 km
Magnolia Power723 MW9.8 km
Carville Energy LLC555 MW19.2 km
PCS Nitrogen Fertilizer LP14 MW20.2 km