← Back to map

Castle Rock Lake SolarUnder construction

Juneau County, Wisconsin · EIA plant ID 69932 · Operator: OneEnergy, Inc.
SolarMISOBA: MISO

5 MW under construction (Solar Photovoltaic), first expected Oct 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 5 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CSTLOSolar PhotovoltaicPV4.54.5planned Oct 2026Under construction—coming soon

Owner / operator

Operator: OneEnergy, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Whistling Winds DPC Solar2 MW0.3 km
Petenwell20 MW10.2 km
New Lisbon Solar3 MW11.3 km
New Lisbon8 MW12.9 km
Webster Creek (Oak 2)2 MW14 km
Castle Rock15 MW15.1 km