← Back to map

Milford Solar Phase IIUnder construction

Beaver County, Utah · EIA plant ID 69930 · Operator: Milford Solar Phase II, LLC
SolarBA: LDWP

310 MW under construction (Solar Photovoltaic), first expected Sep 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 310 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MS2Solar PhotovoltaicPV310310planned Sep 2027Under construction—coming soon

Owner / operator

Operator: Milford Solar Phase II, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Escalante BESS I80 MW1.3 km
Escalante Solar I, LLC80 MW1.7 km
Escalante Solar II, LLC80 MW2.7 km
Milford Solar 199 MW3.5 km
Escalante Solar III, LLC80 MW3.7 km
Rodatherm Milford 1—6.4 km