Portage Solar, LLCUnder construction

Portage County, Wisconsin · EIA plant ID 69887 · Operator: Geronimo Energy
SolarMISOBA: MISO

250 MW under construction (Solar Photovoltaic), first expected Jul 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 250 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PRTGSSolar PhotovoltaicPV250250planned Jul 2027Under construction—coming soon

Owner / operator

Operator: Geronimo Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Vista Sands Solar—2.8 km
Whiting5 MW4.4 km
Stevens Point5 MW7.3 km
Stevens Point Mill8 MW11.9 km
Biron Mill62 MW19 km
Biron6 MW19 km