← Back to map

Ninnescah Flats SolarUnder construction

Pratt County, Kansas · EIA plant ID 69879 · Operator: Nextera Energy Resources
SolarSPPBA: SWPP

202 MW under construction (Solar Photovoltaic), first expected Dec 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 202 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
N3884Solar PhotovoltaicPV201.6201.6planned Dec 2026Under construction—coming soon

Owner / operator

Operator: Nextera Energy Resources. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Kingman Wind215 MW4.8 km
Ninnescah Wind Energy, LLC208 MW4.8 km
Pratt16 MW13.2 km
Pratt 216 MW13.4 km
City of Pratt Solar6 MW14.5 km
BP-Kanza1 MW17.5 km