Bee Hollow Solar, LLCUnder construction

St. Clair County, Illinois · EIA plant ID 69874 · Operator: Geronimo Energy
SolarMISOBA: MISO

150 MW under construction (Solar Photovoltaic), first expected Nov 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 150 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BHSFSolar PhotovoltaicPV150150planned Nov 2026Under construction—coming soon

Owner / operator

Operator: Geronimo Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Prairie State Generating Station1,766 MW8.7 km
Tilden Solar150 MW15.8 km
Baldwin Energy Complex1,260 MW16 km
Baldwin Solar BESS70 MW16.1 km
Freeburg16 MW18.3 km
SV CSG Wagner A LLC2 MW18.4 km