SR Shelby II, LLCPlanned
Shelby County, Tennessee · EIA plant ID 69867 · Operator: SR Shelby II, LLC
6 MW planned (Solar Photovoltaic), first expected Feb 2028 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| SHEII | Solar Photovoltaic | PV | 6 | 6 | planned Feb 2028 | Planned | — | coming soon |
Owner / operator
Operator: SR Shelby II, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| SR Shelby | — | 0.4 km |
| SR Millington II | 75 MW | 3.2 km |
| Millington Solar Farm | 53 MW | 4 km |
| Graceland Solar, LLC | 150 MW | 7 km |
| SR Innovation - NIKE PV | 2 MW | 15 km |
| IKEA Memphis 508 | 1 MW | 18.2 km |