← Back to map

KeamukuPlanned

Hawaii County, Hawaii · EIA plant ID 69795 · Operator: aes clean energy
BatteryBA: HECO

172 MW planned (Batteries, Solar Photovoltaic), first expected May 2030 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
KEABEBatteriesBA8686planned May 2030Planned—coming soon
KEAMUSolar PhotovoltaicPV8686planned May 2030Planned—coming soon

Owner / operator

Operator: aes clean energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
AES Waikoloa Solar Hybrid60 MW3.7 km
Hale Kuawehi Solar Hybrid74 MW8.8 km
Waimea8 MW16.7 km
Keahole89 MW34.6 km
Hamakua Energy Plant66 MW36.6 km
Hawi Wind Farm11 MW43.6 km