Kuihelani Phase 2Planned
Maui County, Hawaii · EIA plant ID 69743 · Operator: aes clean energy
40 MW planned (Solar Photovoltaic), first expected Nov 2028 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| KUIHE | Solar Photovoltaic | PV | 40 | 40 | planned Nov 2028 | Planned | — | coming soon |
Owner / operator
Operator: aes clean energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Maalaea | 230 MW | 0.6 km |
| Kaheawa Wind Power II LLC | 31 MW | 4 km |
| AES Maui Kuihelani Solar Hybrid | 120 MW | 4.8 km |
| Kaheawa Pastures Wind Farm | 30 MW | 5.6 km |
| Kihei Solar Farm | 3 MW | 6.8 km |
| Kuihelani Substation | 1 MW | 7 km |