Pike Island Hydroelectric ProjectPlanned
Jefferson County, Ohio · EIA plant ID 69702 · Operator: Pike Island Hydropower Corporation
20 MW planned (Conventional Hydroelectric), first expected Jan 2029 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| PI-1 | Conventional Hydroelectric | HY | 10 | 10 | planned Jan 2029 | Planned | — | coming soon |
| PI-2 | Conventional Hydroelectric | HY | 10 | 10 | planned Jan 2029 | Planned | — | coming soon |
Owner / operator
Operator: Pike Island Hydropower Corporation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Cardinal | 1,880 MW | 12.3 km |
| Steubenville Solar | — | 22.5 km |
| Wylie Ridge Solar | — | 35.4 km |
| Mitchell (WV) | 1,633 MW | 36.9 km |
| Waste Management Arden LFGTE | 5 MW | 38.3 km |
| New Cumberland Hydroelectric Project | — | 42.5 km |