Mount Olive Solar 3 LLC
Morris County, New Jersey · EIA plant ID 69696 · Operator: Dimension Energy LLC
Nameplate2MWSummer 2 MW
Generators1in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%solar units, summer MW
Heat rate—thermal plants only
First online2025
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2025 | 0 | 0.4% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| MTOI3 | Solar Photovoltaic | PV | 2.2 | 2.2 | Dec 2025 | Operating | — | coming soon |
Owner / operator
Operator: Dimension Energy LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Dimension Energy LLC | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| 350 Clark Solar, NG, LLC | 2 MW | 0.8 km |
| Mount Olive Solar Farm | 20 MW | 2.7 km |
| ACCP NJ 1 | 1 MW | 5 km |
| Benjamin Moore & Co. Solar | 1 MW | 8.1 km |
| Toys R Us- DE, Inc. at Mt. Olive, NJ | 4 MW | 8.8 km |
| Mt Arlington Solar 1 LLC | 2 MW | 9.1 km |