Lucky 7 Solar Farm LLCUnder construction
Hopkins County, Texas · EIA plant ID 69687 · Operator: Lucky 7 Solar Farm LLC
100 MW under construction (Solar Photovoltaic), first expected Oct 2027 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service · 100 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| L7SF | Solar Photovoltaic | PV | 100 | 100 | planned Oct 2027 | Under construction | — | coming soon |
Owner / operator
Operator: Lucky 7 Solar Farm LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Cartwheel 1 - Storage, LLC | 300 MW | 9.9 km |
| Cedar Range Solar | — | 10.2 km |
| Mcmurtre Storage | — | 13.6 km |
| Bright Arrow Solar, LLC | 404 MW | 15.8 km |
| Barrett Solar Project | 125 MW | 22.3 km |
| Willis Storage | — | 23.7 km |