BHER Ravenswood Solar 1
Jackson County, West Virginia · EIA plant ID 69680 · Operator: BHER Ravenswood Solar 1, LLC
Nameplate192MWSummer 192 MW
Generators2in service
Net generation17GWh12 mo to Aug 2026
Capacity factor2%solar units, summer MW
Heat rate—thermal plants only
First online2025
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2025 | 0.3 | 0.2% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| RSBT1 | Batteries | BA | 79 | 79 | Dec 2025 | Operating | — | coming soon |
| RSPV1 | Solar Photovoltaic | PV | 113.1 | 113.1 | Nov 2025 | Operating | — | coming soon |
Owner / operator
Operator: BHER Ravenswood Solar 1, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| BHER Ravenswood Solar 1, LLC | 100.0% | 192 MW |
Nearby plants
Within 80 km.
| Racine | 47 MW | 7.1 km |
| Great Bend Solar Project | 48 MW | 10.9 km |
| Mountaineer | 1,300 MW | 11.8 km |
| Belleville Dam | 42 MW | 24 km |
| Gavin Power, LLC | 2,600 MW | 25.2 km |
| Kyger Creek | 1,087 MW | 26.2 km |