USS Lyndon Solar LLCUnder construction
Whiteside County, Illinois · EIA plant ID 69616 · Operator: United States Solar Corporation
1 MW under construction (Solar Photovoltaic), first expected Oct 2026 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service · 1 MW building
Net generation0GWh12 mo to Dec 2025
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2025 | 0 | — | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| USLYN | Solar Photovoltaic | PV | 1 | 1 | planned Oct 2026 | Under construction | — | coming soon |
Owner / operator
Operator: United States Solar Corporation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Yager | 2 MW | 1.5 km |
| SPG IL Green River CSG | 3 MW | 11.2 km |
| Prophet CSG | 2 MW | 11.9 km |
| Round Grove 1 | 2 MW | 12 km |
| Round Grove 2 | 2 MW | 12 km |
| Yorktown 1 Solar | 2 MW | 13 km |