← Back to map

Pluma - SLT Grant

Grant County, New Mexico · EIA plant ID 69558 · Operator: Standard Solar
SolarSolar PhotovoltaicBA: PNM
Nameplate5MWSummer 5 MW
Generators1in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online2026

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GRANTSolar PhotovoltaicPV4.84.8Sep 2026Operating—coming soon

Owner / operator

Operator: Standard Solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Standard Solar100.0%5 MW

Nearby plants

Within 80 km.
Silver City WWTP PV Project1 MW8.4 km
Chino Mines54 MW9.1 km
Freeport McMoRanretired20.5 km
Luna Energy Facility650 MW63.5 km
Raven Sol Solar CSG—64.8 km
USS Fletcher Solar—65.2 km