← Back to map

CA National City Terminal AveUnder construction

San Diego County, California · EIA plant ID 69533 · Operator: Catalyze National City Terminal Avenue Microgrid, LLC
SolarCAISOBA: CISO

1 MW under construction (Solar Photovoltaic), first expected Nov 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 1 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
21938Solar PhotovoltaicPV1.11.1planned Nov 2026Under construction—coming soon

Owner / operator

Operator: Catalyze National City Terminal Avenue Microgrid, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
County of San Diego SBRC1 MW4.5 km
Peregrine Energy Storage LLC200 MW4.6 km
C P Kelco San Diego Plant29 MW5.1 km
NRG Energy San Diegoretired8.2 km
Naval Hospital Medical Center5 MW8.4 km
Paradise Energy Storage10 MW8.5 km