High Noon Solar Energy LLCUnder construction

Columbia County, Wisconsin · EIA plant ID 69480 · Operator: Invenergy Services LLC
SolarMISOBA: MISO

300 MW under construction (Solar Photovoltaic), first expected Sep 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 300 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
HGHNNSolar PhotovoltaicPV300300planned Sep 2027Under construction—coming soon

Owner / operator

Operator: Invenergy Services LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Columbia (WI)1,112 MW15.9 km
Vienna Walbec Customer Hosted—16.9 km
Clean Fuel Dane Community Digesterretired18.5 km
Dane County Airport Solar11 MW21.5 km
Huiskamp BESS7 MW22.3 km
Portage Industrial Battery5 MW24.8 km