← Back to map

Spencer Clean Energy Center (BESS)

Harris County, Texas · EIA plant ID 69459 · Operator: On Energy Storage
BatteryBatteriesERCOTBA: ERCO
Nameplate12MWSummer 12 MW
Generators1in service
Net generation-0GWh12 mo to Dec 2025
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2025

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-100-80-60-40-200MWh2025

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2025-0.4——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SPBA1BatteriesBA1212Sep 2025Operating—coming soon

Owner / operator

Operator: On Energy Storage. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
On Energy Storage100.0%12 MW

Nearby plants

Within 80 km.
WAL7521 MW3.3 km
WAL27241 MW4.1 km
WAL34251 MW5.5 km
PRSI FCC Generator5 MW7.3 km
Pasadena Cogeneration815 MW7.3 km