Jasper County Solar Project
Jasper County, Indiana · EIA plant ID 69452 · Operator: Biscayne Falls SPV, LLC
Nameplate60MWSummer 60 MW
Generators1in service
Net generation63GWh12 mo to Aug 2026
Capacity factor29%solar units, summer MW
Heat rate—thermal plants only
First online2025
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| Z0001 | Solar Photovoltaic | PV | 60 | 60 | Dec 2025 | Operating | — | coming soon |
Owner / operator
Operator: Biscayne Falls SPV, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Biscayne Falls SPV, LLC | 100.0% | 60 MW |
Nearby plants
Within 80 km.
| Dunns Bridge I Solar | 265 MW | 8.9 km |
| R M Schahfer | 1,105 MW | 9.8 km |
| Bos Dairy, LLC | 1 MW | 11.1 km |
| Hidden View Dairy, LLC | 1 MW | 14.1 km |
| Herrema Dairy | retired | 14.4 km |
| Dunns Bridge II Solar | 491 MW | 15.7 km |